Smartphone displaying DutyWire app with schedule, quick actions, and news updates.

BUILT FOR SHIFT WORK. DESIGNED FOR LIFE AT HOME.

DutyWire was designed for first responders, shift workers, and their families who deal with rotating schedules, overtime, and unpredictable routines.

More than just a calendar, it combines scheduling, fitness, budgeting, recordkeeping, and job-related updates into one platform, providing shift workers a better way to stay organized both on and off the job.

Mobile phone displaying a productivity app called DutyWire with schedule, quick actions, and news updates.

EVERYTHING UNDER ONE ROOF

  • SHIFT SCHEDULING

  • SHARED FAMILY CALENDARS

  • INCOME & OVERTIME TRACKING

  • FITNESS & ROUTINES

  • RECORDS & DOCUMENTS

  • INFORMATION HQ

More than just a calendar, it combines scheduling, fitness, budgeting, recordkeeping, and job-related updates into one platform, providing shift workers a better way to stay organized both on and off the job.

A smartphone screen showing an app interface for setting shift rotation schedules with options such as 4 On / 4 Off, 4 On / 3 Off, 5 On / 2 Off, 5 On / 3 Off, and custom rotation, along with date range and preview details.
Smartphone screens displaying a digital calendar app with scheduled work events for April 2026, including options for creating reusable shift templates and customizing schedules.
A digital calendar app showing appointments for April 2026, including work and practice schedules, with options to customize, view different calendars, and set sharing preferences.
Pension Pending Hoodie
$39.99

Disclaimer: This hoodie runs small. For the perfect fit, we recommend ordering one size larger than your usual size.

• 100% cotton face
• 65% ring-spun cotton, 35% polyester
• Front pouch pocket
• Self-fabric patch on the back
• Matching flat drawstrings
• 3-panel hood
• Blank product sourced from Pakistan

Dutywire Oversized Tee
$34.99
This heavyweight, boxy tee brings quiet, lived-in style to everyday wear. Built from 100% carded cotton and dyed after sewing for soft, faded edges, it wears in like a favorite found piece—sturdy, comfortable, and casually confident. The minimalist chest text sits low and subtle, letting the relaxed dropped shoulders and oversized silhouette do the talking. Durable details like shoulder-to-shoulder twill tape and double-needle stitching keep the shape through repeated wear, while the ribbed collar snaps back after each pull-over. Choose embroidery for a textured, artisanal finish. It’s a simple, dependable layer that slips into the routines of people who value comfort, restraint, and slow style.

Product features
- 100% carded cotton heavyweight (7.1 oz/yd²) for durability and structure
- Boxy, oversized fit with dropped shoulders for a relaxed, modern silhouette
- Shoulder-to-shoulder twill tape and double-needle stitching for long-lasting construction
- Ribbed collar and tear-away label for comfort and easy wear
- Garment-dyed after sewing for faded edges and subtle color gradients; embroidery option available

Care instructions
- Machine wash: cold (max 30C or 90F)
- Non-chlorine: bleach as needed
- Tumble dry: low heat
- Iron, steam or dry: low heat
- Do not dryclean
Dad Shift Embroidered Sweatshirt
$40.00
Soft, low-profile crewneck sweatshirt designed for everyday wear and subtle style. The medium-heavy 50/50 cotton-poly blend feels substantial without being bulky, and the tubular knit construction gives a clean, seam-free silhouette. Embroidered branding options on the chest or wrists add a handcrafted touch that ages well. Durable double-needle stitching and a ribbed knit collar keep the shape through repeated wear. Breathable, OEKO-TEX dyed fabric and ethically sourced cotton make this sweatshirt feel responsible as well as reliable — the kind of layer you reach for on cool mornings, longer drives, or relaxed evenings with friends.

Product features
- 50/50 cotton-poly medium-heavy (8.0 oz/yd²) fabric for warmth and durability
- Tubular knit (no side seams) for a clean silhouette and reduced waste
- Embroidery available on left/center/large center chest and both wrists
- Double-needle stitching and ribbed knit collar for long-lasting shape retention
- OEKO-TEX certified dyes and US Cotton Trust Protocol–backed cotton

Care instructions
- Machine wash: cold (max 30C or 90F)
- Non-chlorine: bleach as needed
- Tumble dry: low heat
- Do not dryclean
-
Peaked Sweatshirt
$37.00
• 50% cotton, 50% polyester
• Pre-shrunk
• Classic fit
• 1x1 athletic rib knit collar with spandex
• Air-jet spun yarn with a soft feel
• Double-needle stitched collar, shoulders, armholes, cuffs, and hem

Disclaimers:
• Due to the fabric properties, the White color variant may appear off-white rather than bright white.
• Subtle orange hue shifts with lighting in the Orange color variant.
Shop All